Our company has accomplished a major part of this project, with a distance of 140 km (12o km from Safaga to Sohag and 20 km towards Qena). This project included: |
|
»Breaking and digging rocks to reach to the perfect earth level. |
|
»Filling the earth and building bridges to reach to the perfect earth level. |
|
»Making a basic layer out of the broken rocks |
|
»The spraying of the instilling layer MCO |
|
»Putting up an asphalt ligamental layer |
|
»Building industrial works |
|
The project was accomplished on the planned date and it was opened by the president. |
|