employeryearBusiness type
Armed Forces Engineering Authority2023Development works for the Alexandria-Matrouh coastal road, with a length of 55 kilometers, from the intersection of Wadi El-Natroun Road, Alamein to the entrance to Elamein Airport, Project No. 8/1733/I/1/2021/Works.
General Authority for Roads, Bridges and Land Transport2023Earthen bridge works and industrial works for the high-speed electric train project (Ain Sokhna - Matrouh) to implement the earthen bridge works in the Wadi Al-Matroun sector - Borg El Arab - Alexandria)
General Authority for Roads, Bridges and Land Transport2022Developing and raising the efficiency of the Wadi El-Natroun/Alamein road from kilometer 40 to kilometer 60, with a length of 20 km in both directions (main + service)
General Authority for Roads, Bridges and Land Transport2021Works to raise the efficiency and maintenance of the Matrouh/Salloum International Coastal Road (Northern Marine End) in the distance from km 147 to km 158, with a length of 11 km.
Engineers Department - Armed Forces Engineering Authority2021Implementation of asphalt road works on Farafra Road entering from kilometer mark 130, kilometer mark 170, Project No. 97/Works 2/2021/2022.
General Authority for Roads and Bridges2020The project of paving the eastern entrance to Talkha (Sectors One, Two, and Three) is being implemented.
General Authority for Roads and Bridges2020Implementation work is underway on the project to construct the southern coastal road from El Alamein Circle to Dabaa, with a length of 42 km (5 lanes in each direction). The first sector, with a length of 21 km.
Department of Military Engineers2020Works are underway on the international coastal road from kilometer 22 to kilometer 47
Northern Military Region (Engineering Division of the Armed Forces)2020Internal road works are being implemented in the city of Bashayer Al-Khair (3), the second phase
General Authority for Roads, Bridges and Land Transport2020The process of raising the efficiency of the international coastal road from Sidi Abdel Rahman at El-Dabaa, the tribal direction, with a length of 28 km, was implemented.
General Authority for Roads, Bridges and Land Transport2020Works to raise the efficiency of the international coastal road from Sidi Abdel Rahman to El Dabaa, with a length of 28 km
General Authority for Roads, Bridges and Land Transport2019Implementation work is underway to strengthen and create a third lane to develop the Gamasa tributary road, sector two, with a length of 20 km.
General Authority for Roads, Bridges and Land Transport2018Works were carried out to raise the efficiency of the Alexandria-Matrouh coastal road in the distance from El Alamein to Sidi Abdel Rahman, with a length of 21 km.
General Authority for Roads, Bridges and Land Transport2018A road parallel to the Safaga - Marsa Alam - Third Sector Road, with a length of 50 km, was constructed.
General Authority for Roads, Bridges and Land Transport2018Implementation of works to raise the efficiency of the Qena-Sohag Western Desert Road - the first phase, in the distance from kilometer zero to kilometer 70, with a length of 70 kilometres, and the initial completion took place on 3/20/2018.
Armed Forces Engineering Authority - Department of Military Engineers2017Alexandria-Marsa Matrouh coastal road development project from km 80 to km 93 (the main road in both directions) and service roads
General Authority for Roads, Bridges and Land Transport2017The remaining works of the Dabaa - Fouka road operation on the Alexandria - Matrouh road, with a length of 50 km, have been carried out.
Armed Forces Engineering Authority - Department of Military Engineers2017Works to increase the efficiency of the monster's beak connection
Armed Forces Engineering Authority - Department of Military Engineers2016Implementation of a 23.5 km double Jabal Hamed link road.
General Authority for Roads, Bridges and Land Transport2016Implementation of dual works on the Western Desert Road, Sohag - Qena, the first sector towards Sohag, with a length of 35 km, and the initial completion was completed on 9/22/2018.
General Authority for Roads, Bridges and Land Transport2016Implementing a project to raise the efficiency of the Assiut-Sohag Red Sea Road (Sector Four), connections, and the entrance to the city of Qena.
General Authority for Roads, Bridges and Land Transport2014Implementing the Qena-Safaga road works (Sector Two), with a length of 60 km, starting from the city of Qena.
Sudan Roads and Bridges Authority2013Earthworks, auxiliary foundation layers and the foundation for the construction of the Tokar-Jarora road, 179.7 km long, in the Republic of Sudan.
Central Reconstruction Authority (Northwest Coast Reconstruction Authority)2011انشاء ورصف طريق سيوه الواحات - بطول ١٠٠ كيلومتر
Barwa project2010Construction and paving of the ring road around the Barwa project - New Cairo City
Barwa project2010Internal roads and settlements for an area of ​​2000 acres in New Cairo
Ministry of Investment - General Authority for Roads2007Construction and paving of the Upper Egypt-Red Sea-Safaga sector road with a length of 140 km
The General Authority for Roads - Republic of Sudan - worth 29 million US dollars, equivalent to about 170 million Egyptian pounds.2005The road from Gedaref - Dokar - Qalabat of Mosul between the Republic of Sudan and the State of Ethiopia is 156 km long.
New Burj Al Arab City Authority2004Road works for the seventh district in Burj Al Arab city
Alexandria Governorate - Roads Directorate2003Road paving works in Alexandria Governorate between 2001 and 2003
Central Reconstruction Agency2001International Coastal Road - Alexandria/Rashid
Northwest Coast Reconstruction and Development Authority2001Construction and paving of the ring road around the city of Matrouh
For the Central Reconstruction Authority2000Extension of Sh. 45, tributary of the international road
Central Reconstruction Agency2000International Coastal Road, Sector 7 - Mubarak Link
New Burj Al Arab City Authority2000Asphalt road works in New Burj Al Arab City
Northwest Coast Reconstruction Authority1997Rafid Imtad 7/ (Mubarak link
Armed Forces Engineering Authority1996Construction and paving of the third sector on the Wadi El Natroun/El Alamein road
Ministry of Water Resources and Irrigation1995Construction of the protective bridge for the main bank in the Bousili desert in Rashid
North Coast Reconstruction and Development Authority1994Construction of Al-Jara Bir Al-Nus road in Siwa
Sinai Reconstruction Authority1993Taba-Rafah international road