Armed Forces Engineering Authority | 2023 | Development works for the Alexandria-Matrouh coastal road, with a length of 55 kilometers, from the intersection of Wadi El-Natroun Road, Alamein to the entrance to Elamein Airport, Project No. 8/1733/I/1/2021/Works. |
General Authority for Roads, Bridges and Land Transport | 2023 | Earthen bridge works and industrial works for the high-speed electric train project (Ain Sokhna - Matrouh) to implement the earthen bridge works in the Wadi Al-Matroun sector - Borg El Arab - Alexandria) |
General Authority for Roads, Bridges and Land Transport | 2022 | Developing and raising the efficiency of the Wadi El-Natroun/Alamein road from kilometer 40 to kilometer 60, with a length of 20 km in both directions (main + service) |
General Authority for Roads, Bridges and Land Transport | 2021 | Works to raise the efficiency and maintenance of the Matrouh/Salloum International Coastal Road (Northern Marine End) in the distance from km 147 to km 158, with a length of 11 km. |
Engineers Department - Armed Forces Engineering Authority | 2021 | Implementation of asphalt road works on Farafra Road entering from kilometer mark 130, kilometer mark 170, Project No. 97/Works 2/2021/2022. |
General Authority for Roads and Bridges | 2020 | The project of paving the eastern entrance to Talkha (Sectors One, Two, and Three) is being implemented. |
General Authority for Roads and Bridges | 2020 | Implementation work is underway on the project to construct the southern coastal road from El Alamein Circle to Dabaa, with a length of 42 km (5 lanes in each direction). The first sector, with a length of 21 km. |
Department of Military Engineers | 2020 | Works are underway on the international coastal road from kilometer 22 to kilometer 47 |
Northern Military Region (Engineering Division of the Armed Forces) | 2020 | Internal road works are being implemented in the city of Bashayer Al-Khair (3), the second phase |
General Authority for Roads, Bridges and Land Transport | 2020 | The process of raising the efficiency of the international coastal road from Sidi Abdel Rahman at El-Dabaa, the tribal direction, with a length of 28 km, was implemented. |
General Authority for Roads, Bridges and Land Transport | 2020 | Works to raise the efficiency of the international coastal road from Sidi Abdel Rahman to El Dabaa, with a length of 28 km |
General Authority for Roads, Bridges and Land Transport | 2019 | Implementation work is underway to strengthen and create a third lane to develop the Gamasa tributary road, sector two, with a length of 20 km. |
General Authority for Roads, Bridges and Land Transport | 2018 | Works were carried out to raise the efficiency of the Alexandria-Matrouh coastal road in the distance from El Alamein to Sidi Abdel Rahman, with a length of 21 km. |
General Authority for Roads, Bridges and Land Transport | 2018 | A road parallel to the Safaga - Marsa Alam - Third Sector Road, with a length of 50 km, was constructed. |
General Authority for Roads, Bridges and Land Transport | 2018 | Implementation of works to raise the efficiency of the Qena-Sohag Western Desert Road - the first phase, in the distance from kilometer zero to kilometer 70, with a length of 70 kilometres, and the initial completion took place on 3/20/2018. |
Armed Forces Engineering Authority - Department of Military Engineers | 2017 | Alexandria-Marsa Matrouh coastal road development project from km 80 to km 93 (the main road in both directions) and service roads |
General Authority for Roads, Bridges and Land Transport | 2017 | The remaining works of the Dabaa - Fouka road operation on the Alexandria - Matrouh road, with a length of 50 km, have been carried out. |
Armed Forces Engineering Authority - Department of Military Engineers | 2017 | Works to increase the efficiency of the monster's beak connection |
Armed Forces Engineering Authority - Department of Military Engineers | 2016 | Implementation of a 23.5 km double Jabal Hamed link road. |
General Authority for Roads, Bridges and Land Transport | 2016 | Implementation of dual works on the Western Desert Road, Sohag - Qena, the first sector towards Sohag, with a length of 35 km, and the initial completion was completed on 9/22/2018. |
General Authority for Roads, Bridges and Land Transport | 2016 | Implementing a project to raise the efficiency of the Assiut-Sohag Red Sea Road (Sector Four), connections, and the entrance to the city of Qena. |
General Authority for Roads, Bridges and Land Transport | 2014 | Implementing the Qena-Safaga road works (Sector Two), with a length of 60 km, starting from the city of Qena. |
Sudan Roads and Bridges Authority | 2013 | Earthworks, auxiliary foundation layers and the foundation for the construction of the Tokar-Jarora road, 179.7 km long, in the Republic of Sudan. |
Central Reconstruction Authority (Northwest Coast Reconstruction Authority) | 2011 | انشاء ورصف طريق سيوه الواحات - بطول ١٠٠ كيلومتر |
Barwa project | 2010 | Construction and paving of the ring road around the Barwa project - New Cairo City |
Barwa project | 2010 | Internal roads and settlements for an area of 2000 acres in New Cairo |
Ministry of Investment - General Authority for Roads | 2007 | Construction and paving of the Upper Egypt-Red Sea-Safaga sector road with a length of 140 km |
The General Authority for Roads - Republic of Sudan - worth 29 million US dollars, equivalent to about 170 million Egyptian pounds. | 2005 | The road from Gedaref - Dokar - Qalabat of Mosul between the Republic of Sudan and the State of Ethiopia is 156 km long. |
New Burj Al Arab City Authority | 2004 | Road works for the seventh district in Burj Al Arab city |
Alexandria Governorate - Roads Directorate | 2003 | Road paving works in Alexandria Governorate between 2001 and 2003 |
Central Reconstruction Agency | 2001 | International Coastal Road - Alexandria/Rashid |
Northwest Coast Reconstruction and Development Authority | 2001 | Construction and paving of the ring road around the city of Matrouh |
For the Central Reconstruction Authority | 2000 | Extension of Sh. 45, tributary of the international road |
Central Reconstruction Agency | 2000 | International Coastal Road, Sector 7 - Mubarak Link |
New Burj Al Arab City Authority | 2000 | Asphalt road works in New Burj Al Arab City |
Northwest Coast Reconstruction Authority | 1997 | Rafid Imtad 7/ (Mubarak link |
Armed Forces Engineering Authority | 1996 | Construction and paving of the third sector on the Wadi El Natroun/El Alamein road |
Ministry of Water Resources and Irrigation | 1995 | Construction of the protective bridge for the main bank in the Bousili desert in Rashid |
North Coast Reconstruction and Development Authority | 1994 | Construction of Al-Jara Bir Al-Nus road in Siwa |
Sinai Reconstruction Authority | 1993 | Taba-Rafah international road |